Getting paid, 29 October 2026

Deposits and stage payments for domestic work

Take a deposit that covers what you'll spend before the first stage payment, usually materials ordered for the customer and any made-to-measure items, then bill the rest in stages tied to finished work. On a £42,000 extension, a 20% deposit (£8,400) and four stages of £8,400 keeps you from funding the job yourself. Put the schedule in the signed quote.

How much deposit should a builder take?

Enough to cover your outlay before the first stage payment, and no more than you can justify. On most domestic jobs that's the materials you'll order for this customer, plus anything made to measure: windows, a kitchen, steels, a staircase. A deposit that matches real costs is easier to defend if the customer cancels.

There's no single right percentage. A bathroom where you buy £3,500 of sanitaryware and tiles up front needs a bigger share than a decorating job where the paint costs £200. Work it out from the job, then round it.

Calculator: Deposit and stage payments
£
%
Deposit–

Your numbers, not a promise. Change any figure to match your firm.

The default is a £42,000 extension with a 20% deposit and four stages: £8,400 deposit, £33,600 left to bill, £8,400 a stage. Change the figures to your own job.

How do you set stage payments?

Tie each stage to a point the customer can see is finished, and make each one cover the cost of the next stretch of work. Avoid stages tied to dates alone; if the job slips, the customer will argue it isn't due.

Worked example

Payment schedule for a £42,000 single-storey extension

Ten-week build. Contract price £42,000 including VAT.

Deposit on signing, for steels, windows and first materials20%£8,400
Stage 1: foundations and slab passed by building control20%£8,400
Stage 2: walls to wall plate, roof structure on20%£8,400
Stage 3: watertight, first fix done20%£8,400
Stage 4: practical completion and snagging list agreed20%£8,400
Total5 × £8,400£42,000
Each payment roughly covers the next stage's materials and two weeks' labour, so the builder is never more than one stage out of pocket. Figures are illustrative.

On longer jobs, some builders hold a small final amount, say 5%, until snagging is done. That's fair to the customer and gives you a clear finish line. If the job has variations, bill them with the next stage rather than at the end; see how to price variations.

Payment terms wording for a domestic quote
Payment terms
This quote is for £total including VAT / no VAT is charged.

1. Deposit of £deposit on acceptance. This pays for materials ordered for your job, e.g. steels, windows and the first materials delivery, which we order on receipt.
2. £stage 1 when stage 1 milestone, e.g. foundations are passed by building control.
3. £stage 2 when stage 2 milestone.
4. £stage 3 when stage 3 milestone.
5. £final on completion, when we've walked round together and agreed any snagging.

We'll send an invoice at each stage with photos of the work. Payment is due within 7 days of each invoice by bank transfer to account details.

Agreed variations will be priced in writing before the work is done and added to the next stage invoice.

Your right to cancel is set out in the attached cancellation information.

What consumer rules apply to deposits?

Two sets matter most for homeowners in Great Britain: cancellation rights when you agree the contract in their home, and fairness rules for what you keep if they cancel.

You must also give the customer the cancellation information and form before the contract. If they cancel in the 14 days and you haven't started, the deposit generally goes back.

On keeping a deposit after a later cancellation, the Competition and Markets Authority's unfair terms guidance gives a term letting a trader keep all prepayments whatever the circumstances as an example of one that can be unfair, and says charges shouldn't go beyond what's needed to protect your legitimate interests. Unfair terms don't bind the consumer, and you may have to repay money taken under them. In practice: keep what covers your real costs, such as made-to-measure items and work done, and say so in the quote. If a large sum is at stake, ask a solicitor.

The Construction Act's statutory right to stage payments doesn't apply to a contract with a homeowner for work on the home they live in, so for domestic work, your quote is the only thing giving you stage payments. Write them in.

How do you handle VAT on a deposit?

If you're VAT-registered, a deposit that's a part payment for the work usually creates a tax point when you receive it or invoice it, whichever is first. So VAT on the deposit goes in the VAT return for the period you received it, not when the job finishes.

HMRC's VAT guide says most deposits serve as advance payments and create tax points. Work it into your cash flow forecast so the VAT on a big deposit is there when the quarter's bill arrives. Ask your accountant if you're unsure how a particular deposit should be treated.

What if a customer won't pay a deposit?

Explain what it pays for, and offer to show the order. Most refusals come from customers who've been burned before, or who think the deposit is profit. Pointing to the specific items, "this pays for your steels and windows, which we order the day it arrives", usually settles it.

Quoting fast and sending the payment terms with the quote means the deposit question comes up before the customer says yes, not after. A renovation builder we work with sends branded proposals and contracts with the stage payments written in; it's part of what got his admin from about two days a week down to about 30 minutes a day.

If a customer still won't pay anything up front on a job where you're buying made-to-measure items, think hard about whether you want the job. You'd be lending them the money. See quote acceptance and deposits for how to put it at the point they accept.

Why do stage payments matter so much for cash flow?

Because without them you pay for the whole job before you're paid for any of it. On the £42,000 extension, with no deposit and one invoice at the end, the builder carries ten weeks of wages and every materials bill. With the schedule above, the builder is never more than about one stage, £8,400, out of pocket. If you feel busy but broke, unstaged domestic jobs are often why.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

For domestic jobs, Nexley puts the deposit and stage schedule into every quote it drafts, then raises each stage invoice when you send a voice note saying a stage is done, with photos attached. You approve each one before it goes, and it chases the customer if a stage payment is late.

Common questions

Is a 50% deposit too much for building work?

It can be, unless your costs before the first stage are that high, for example a kitchen made to order. Size the deposit to your real outlay and explain it; a customer who sees what it pays for is more likely to agree, and the term is easier to defend.

Can I keep the deposit if the customer cancels?

It depends on when and what you've spent. In the 14-day cancellation period for an off-premises contract, you generally refund it unless they asked you to start. After that, keep what reflects your real costs and work done; keeping everything regardless can be unfair.

Should stage payments include VAT?

If you're VAT-registered and the work is standard-rated, yes: each stage invoice shows VAT, and each payment creates its own tax point.

Do the same rules apply in Scotland and Northern Ireland?

Consumer cancellation rights apply to homeowners across the UK, but check local guidance for details. The construction payment rules differ by nation and are not written for homeowners' own homes, so put stage payments in your contract wherever you work.

Sources

  1. GOV.UK: Consumer Contracts (Information, Cancellation and Additional Charges) Regulations guidance (PDF)
  2. GOV.UK: CMA unfair contract terms guidance, CMA37 (PDF)
  3. legislation.gov.uk: Housing Grants, Construction and Regeneration Act 1996, section 106
  4. legislation.gov.uk: Housing Grants, Construction and Regeneration Act 1996, payment sections
  5. GOV.UK: VAT guide (VAT Notice 700)

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Getting paid

Keep reading

Getting paid

How to know if a job made money: job costing for trades

Most trade owners find out a job lost money months later, if ever. This guide shows the four costs to track per job, with a quoted-versus-actual worked example on a garage conversion and a calculator for your last job.

29 Oct 2026, 6 min read, Kade Dillon

Getting paid

Matching supplier invoices to jobs in Xero

Supplier bills only tell you about a job if they're coded to it. This guide sets up job tracking in Xero, works through splitting one merchant invoice across three jobs, and gives you a weekly checklist.

29 Oct 2026, 6 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
I had a quick demo and we’ve never looked back. Nexley works, it’s simple, and we’re really happy. Just give it a try.”
— Pete Charley

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us