An electrical tender is priced by counting points from the drawings, pricing each type of point from your labour time and materials, then adding distribution boards, containment, testing and certification as separate lines. Settle who carries the design before you price. AI can count symbols and read long specs fast; you check the count and own the price.

What makes electrical tenders hard to price?

The pack is long, the drawings change and the risk sits outside the points. A typical commercial package has lighting and power layouts, a schematic, a spec running to dozens of pages, and a schedule of rates that asks for a figure per point while the costs that hurt are in containment, boards and testing.

The trade-specific problems tend to be the same on every job:

  • Price per point. Clients compare a single rate, but a double socket on a solid wall and one on a dado trunking are different jobs.
  • Containment. Tray, basket and trunking runs are often shown schematically or not at all.
  • Design responsibility. Specs often say "contractor to complete the design" or "design development by the electrical subcontractor", which moves risk to you.
  • Spec changes. Revised layouts arrive mid-tender and the point count moves.
  • Testing and certification. Someone must sign each part of the certificate, and on a bigger job that is days of work.

An electrical contractor in Essex we spoke to, a one-man band in his second year pricing tenders from drawings, tracked 60 to 70% of his time on admin. Tender packs are a big part of that for a small electrical firm, because every revision means recounting.

How do you price an electrical tender from the drawings?

Count every point by type, price each type at its own rate, then add the items that aren't points. Keep the count on a schedule with drawing references so you can recount quickly when a revision lands.

Worked example

A 1,200-point office refurbishment, two floors

Points counted from lighting and small power layouts at revision C. Rates include first and second fix, materials and margin.

Double sockets420 × £68£28,560
Lighting points380 × £55£20,900
Switches and lighting controls160 × £48£7,680
Data outlets, containment and back box only140 × £42£5,880
Fused spurs60 × £62£3,720
Emergency lighting points40 × £110£4,400
Points total, 1,200 points£71,140
Distribution boards, supplied and fitted6 × £1,450£8,700
Cable tray and basket from the schematic320 m × £24£7,680
Testing, inspection and certification6 days × £300£1,800
Tender price for the package£89,320
Rates are illustrative. Builder's work in connection, fire stopping and design are excluded and stated in the clarifications.

Notice that the non-point items are a fifth of the price. A rate per point that tried to carry them would look high on the schedule and would be wrong as soon as the containment changed. For setting the rates themselves, see price per point for electrical work.

Calculator: Price per point
min
£
£
%
Price per point–

Your numbers, not a promise. Change any figure to match your firm.

Use your own minutes per point from recent jobs of the same type. Fifty minutes for first and second fix on an open-plan office ceiling grid is a different figure from a refurbishment with chased walls.

Is design responsibility in your scope?

Often it is without you noticing. Read the spec and the contract for "design", "design development", "complete the design" or "contractor's design portion"; if any of them apply to your package, you're carrying design risk and should price or clarify it.

The certificate shows why this matters. The model Electrical Installation Certificate published with BS 7671 has separate declarations for design, construction, and inspection and testing, each signed by the person responsible for that part. If you sign the design section, you're certifying that the design work you were responsible for meets BS 7671. In dwellings, Approved Document P also says installations should be designed and installed to BS 7671, and new circuits, consumer unit replacements and work in special locations such as bathrooms are notifiable.

Quick check: Is design responsibility in your scope?
Does the spec or contract use the words "design", "design development" or "contractor's design portion" for your package?
Has the consultant issued a full design (cable sizes, protective devices, schematics) you'll install to?
Are the drawings marked "indicative" or "for tender only", or are cable sizes missing?
You're carrying the design

Price the design time, check your professional indemnity cover, and say in the clarifications exactly which parts you're designing. You'll sign the design section of the certificate.

Design is shared or unclear

Clarify before the deadline: ask which parts are fully designed and which you're expected to complete. Price the part you design and exclude the rest.

Install only

You install to the consultant's design. State that design remains with the designer and that changes to it are variations.

What should an electrical tender clarify?

Design, testing, containment and builder's work, first and specifically. These are the four lines that main contractors most often read differently from the electrician.

Electrical tender clarifications
Tender: project name, electrical installation package
Our price: £amount excluding VAT, dated date

Design
1. Price based on the consultant's design, drawings numbers and revisions and specification reference. Design responsibility remains with the designer except any items we design.
2. Cable sizes and protective devices as shown. Changes arising from design development will be valued as variations.

Points and quantities
3. Point count taken from layouts drawing numbers at revision letter: number points. Changes to layouts after this revision will be valued at our schedule rates.

Containment
4. Containment priced as shown on schematic or drawing: metres m of tray and basket. Additional containment at £rate per metre.

Testing and certification
5. Initial verification and certification to BS 7671 included for our installation only. Testing of others' work, fire alarm cause and effect and witness testing beyond number days excluded.

Builder's work and fire stopping
6. Builder's work in connection, chasing, making good, holes through fire-rated walls and fire stopping excluded.

Supplies and others
7. Incoming supply, metering and DNO charges by others.
8. Data cabling, termination and testing excluded; containment and back boxes only as listed.
9. Price valid for number days; cable and switchgear subject to supplier price changes after that date.

If you've already got exclusions in a Word document, start from that and edit it per tender. The qualifications and exclusions guide covers the general wording and how it behaves on public work.

What can AI do on an electrical tender, and what can't it?

AI is good at the counting and the reading; it's weak where the information isn't on the drawing. Treat its output as a first count you check, not a finished price.

What it does well:

  • Symbol counts. Counting sockets, lights and switches on clean CAD-exported PDFs is a strong use. Scanned or hand-marked drawings are weaker, so spot-check one floor.
  • Reading the spec. Pulling out design wording, testing requirements, named products and "or equivalent" clauses from a long document.
  • Comparing revisions. Telling you which points moved between revision B and C, so you don't recount from scratch.
  • Drafting the clarifications from your standard list with the right drawing numbers.

What still needs you:

  • Minutes per point. Your labour figure depends on the building, the ceiling and the access.
  • Containment routes that the drawings show only as a line or not at all.
  • Design judgement. Whether a "design development" clause is a risk you'll accept, and at what price.
  • Sign-off. You sign the certificate, so you sign off the price.

For a fair test of AI counts against your own, see how to test an AI take-off.

Which electrical tenders should you bid?

The ones where the design is clear, the containment is shown and you can do the testing with your own people. Use the 10-minute tender read first, and walk away from packs that hand you the design with no fee for it or fix a programme with no allowance for testing time.

Small electrical firms win most often on packages they can staff without subcontracting the testing, where a clean clarifications sheet makes them easier to compare than larger bidders. For how Nexley works for electrical firms more widely, see the electrical trade page.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

For electrical tenders, you forward the drawings and spec on WhatsApp and Nexley counts points by type, picks up design wording, testing requirements and named products from the spec, and drafts a priced schedule from your point rates, with boards, containment and testing as separate lines. When a revision arrives it shows what changed. You check the count and approve the price and clarifications.

Common questions

What counts as a point in an electrical tender?

Any outlet or connection: a socket, a light, a switch, a fused spur, a data outlet. Agree the definition with the main contractor if the schedule doesn't give one, especially for data, where you may be pricing back boxes only.

Should containment be in the price per point?

No. Price it per metre from the schematic. Containment changes independently of the point count, and a separate line makes variations easier to value.

Can AI count points from a scanned drawing?

Sometimes, with more errors. Ask for CAD-exported PDFs, and check one floor by hand before you trust the rest.

Who signs the design section of the certificate?

The person responsible for the design. If that's the consultant, they sign; if your contract makes you responsible for design, you do. Get it settled at tender.

Sources

  1. IET: BS 7671 model Electrical Installation Certificate
  2. GOV.UK: Approved Document P, Electrical safety: dwellings

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Tendering and estimating

Keep reading

Tendering and estimating

AI tendering for roofers

Roof tenders are won and lost on the rate per square metre and the risks hidden behind it. This guide prices a 420 m² flat roof line by line, gives you a quick check for per m² or per day, a calculator and a qualifications list to copy.

29 Oct 2026, 9 min read, Kade Dillon

Tendering and estimating

AI tendering for dryliners

Drylining tenders are priced per m² of partition, but the risk sits in the system spec. This guide prices a 380 m² partition package, gives a quick check on substituting the specified system, a calculator and qualifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Tendering and estimating

AI tendering for plumbing and heating engineers

Heating tenders look like equipment lists, but the risk sits in design, commissioning and kit lead times. This guide prices an eight-house heating package, gives a quick check on design-and-install, clarifications to copy and a tender handled over WhatsApp.

29 Oct 2026, 8 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
Nexley saves me so much time it’s unbelievable. Was sceptical at first but when I saw what it can do for my business I couldn’t sign up quick enough. Can’t recommend highly enough.”
— Jonny Monk

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us