Take-offs and bills of quantities from your drawings

Send Nexley the PDF drawings and ask for the measure — typed from the office, or by voice from the van between jobs. It takes off the quantities, itemises every line against the drawing it came from, and assembles a bill of quantities to NRM2 with your rates against each item. The scale rule, the highlighters and the Sunday afternoon disappear; the checking stays with you.

  • Works from PDF drawings
  • Ask by voice from site
  • Every line traceable

The measure is the slowest hour in construction

Every contractor knows the ritual. Print the drawings — or squint at them on a screen — and work across each one with a scale rule: lengths, areas, counts, transferred by hand into a spreadsheet that has grown its own habits over the years. It is slow, it is error-prone at the exact moment accuracy matters most, and it is almost always done at night, because daylight belongs to the jobs already won.

Miss a run on one drawing and the mistake compounds silently: the quantity is wrong, so the material order is wrong, so the price is wrong — and you discover it on site, where it is most expensive to fix.

How a Nexley take-off works

  • Drop in the drawing PDFs. Architectural, structural or services layouts — whatever the pack contains, including revisions. No re-drawing, no tracing, no special file format.
  • Ask for what you need, in plain words. “Measure the partitions on the first-floor plan” or “count the sockets on drawing 04, revision C”. If you are on site with your phone, say it as a voice note — the measure comes back the same way a colleague's would.
  • Get itemised quantities, not a black box. Each line shows what was measured, from which drawing, in which unit. If a figure looks off, you trace it to the source in one step and correct it — the point is a measure you can defend, not one you must take on faith.
  • The bill assembles itself around your rates. Quantities flow into an NRM2-structured bill of quantities with your labour and material rates against each item and provisional sums flagged where the drawings leave gaps. From there it is one step to a tender submission or a priced quote.

Why the format matters as much as the numbers

A main contractor's surveyor opens dozens of subcontractor bills a month. A tidy NRM2 structure with clean work sections reads as a firm that knows what it is doing; a homemade spreadsheet with merged cells reads as risk. The same quantities, presented properly, get taken more seriously — and when the valuation argument comes mid-contract, a bill with traceable measured quantities is the document you want to be holding.

Take-offs and bills are included in the single Nexley plan — no per-drawing charge, no per-bill charge, and a 7-day free trial to run it on a real tender pack first. If you currently farm measurement out, the comparison with hiring a QS sets out fairly what changes and what does not.

See a take-off on your own drawings

What contractors use it for

The same engine, three different days of the week.

Tender day

A full pack lands at 4pm with a deadline next week. The take-off and draft bill are ready for review before you have finished reading the preliminaries.

AI tendering & estimating →

Site day

The client asks “what would it cost to add the extra room?” while you are stood in it. A voice note from the car park starts the measure before you are back at the office.

Automated quoting →

Order day

Accurate quantities mean material orders that match the job — and a measured bill is what lets Nexley price the same list across up to 20 merchants before you buy.

Supplier sourcing →

Measure your next drawing pack with Nexley

Try free for 7 days, no credit card required.

No card required Instant set up Cancel anytime
Saves me so much time every week. Does internal organisation and admin, but also when a customer messages in, Nexley replies, books them in against when I've got time to do it, and gets the invoice sorted in Xero.
Ollie Cable
WhatsApp Us