AI estimating for drylining contractors

Drylining lives and dies on the rate per square metre — and on noticing when the job on site stops matching the job you priced. Nexley builds your rates up from first principles, turns partition layouts into board and stud schedules, and prices the variation the day the architect moves a wall, so the money follows the drawings instead of leaking between revisions.

  • Rate build-ups you can defend line by line
  • Board schedules straight off the layouts
  • Variations priced while they are still fresh

A rate is an argument — build it so it wins

When a main contractor's surveyor challenges your metre rate, a number scribbled from memory folds. A build-up holds. Nexley assembles each partition type from its parts — metal stud at the specified centres, track top and bottom, the board layers each side, insulation, fixings, tape and joint to the finish level the specification calls for — with your labour constants against every operation. Fire-rated board and acoustic variations become their own types with their own rates, not a hopeful percentage scribbled onto the standard one. The result reads like the workings of a careful estimator, because that is what it is.

From layout drawing to loading-out list

You provideNexley returns
Partition layout drawings with type referencesMeasured areas per type, per floor — the take-off, referenced to each drawing
The partition and lining specificationRate build-ups per type: stud, track, board layers, insulation, tape and joint
Your wastage and labour figuresBoard, stud and screw schedules ready for merchants to price — the loading-out list per floor
A revised layout mid-jobThe re-measure, the priced difference, and a drafted variation notice for your approval

The measurement engine behind this is the same take-off and bill of quantities capability used across trades — pointed here at SFS, partitions, wall linings and ceilings, where the quantities are large, the repetition is high, and a small per-metre error compounds across an entire floor plate.

The variation is where drylining margin goes to die

Every dryliner knows the pattern. Revision C moves three partitions, the site agent says "just crack on", and the paperwork happens at final account — where memory is short and goodwill shorter. Because Nexley holds the measured baseline it priced from, a changed drawing is a re-measure, not an argument: what changed, what it costs at contract rates, drafted as a variation the day it lands via automated quoting. Fire-rated work sharpens the point — a corridor upgraded from one board layer to two is a real cost you either capture that week or donate to the main contractor at the end of the job.

Get a layout measured this week

Try Nexley on your next drylining package

Try free for 7 days, no credit card required.

No card required Instant set up Cancel anytime
Does what it says really. Compared to what I'd have to pay someone to do everything they're looking after, it's worth it.
MJ

Drylining firms usually ask

Layer by layer: studs at their centres, tracks, board layers per side, insulation, screws, tape and jointing, labour — each priced from your own costs so the rate per square metre is defensible line by line when a surveyor pushes back on it.
WhatsApp Us