AI estimating and tendering software for UK construction

Pricing tenders in the evenings?

Construction estimating software that prices tenders from your own rates.

Send the tender pack. The Estimator reads the drawings, spec and pricing schedule, measures the quantities and builds a bill priced from your rates. You check it and decide what to submit.

NexleyEstimator, online
YESTERDAY
EstimatorThe Riverside school package is due Friday at noon. Pack read: 3 questions for the architect drafted.16:30
Send them16:42
EstimatorSent. I'll measure as soon as revision B lands.16:42
TODAY
ZIPtender-pack.zip22 pages, 7 attachmentsPrice this from my rates, due Friday19:58
EstimatorDone. 41 lines measured, each linked to its drawing. 2 provisional sums flagged, and questions for the architect drafted.20:14
XLSBill of quantities, re-roof.xlsx41 lines, NRM2Nothing gets submitted. That's your call.20:14
NexleyEstimator, online
YESTERDAY
EstimatorThe Riverside school package is due Friday at noon. Pack read: 3 questions for the architect drafted.16:30
Send them16:42
EstimatorSent. I'll measure as soon as revision B lands.16:42
TODAY
ZIPme-tender-pack.zip18 pages, 6 attachmentsPrice the mechanical package from my rates, due Friday19:58
EstimatorDone. 63 lines measured off the services drawings, each linked to its sheet. Plant priced at your two suppliers, 3 provisional sums flagged.20:14
XLSBill of quantities, M&E.xlsx63 lines, NRM2Nothing gets submitted. That's your call.20:14
NexleyEstimator, online
YESTERDAY
EstimatorThe Riverside school package is due Friday at noon. Pack read: 3 questions for the architect drafted.16:30
Send them16:42
EstimatorSent. I'll measure as soon as revision B lands.16:42
TODAY
ZIPelectrical-pack.zip18 pages, 6 attachmentsPrice the electrical package from my rates, due Friday19:58
EstimatorDone. 57 lines: points counted off the lighting and power layouts, containment measured, boards and testing added. 2 provisional sums flagged.20:14
XLSBill of quantities, electrical.xlsx57 lines, NRM2Nothing gets submitted. That's your call.20:14
NexleyEstimator, online
YESTERDAY
EstimatorThe Riverside school package is due Friday at noon. Pack read: 3 questions for the architect drafted.16:30
Send them16:42
EstimatorSent. I'll measure as soon as revision B lands.16:42
TODAY
ZIPheating-pack.zip18 pages, 6 attachmentsPrice the plumbing and heating, due Friday19:58
EstimatorDone. 44 lines: pipework measured off the layouts, plant and radiators from the schedules at your merchants, commissioning added. 1 provisional sum flagged.20:14
XLSBill of quantities, plumbing and heating.xlsx44 lines, NRM2Nothing gets submitted. That's your call.20:14
NexleyEstimator, online
YESTERDAY
EstimatorThe Riverside school package is due Friday at noon. Pack read: 3 questions for the architect drafted.16:30
Send them16:42
EstimatorSent. I'll measure as soon as revision B lands.16:42
TODAY
ZIPgroundworks-pack.zip18 pages, 6 attachmentsPrice the groundworks from my rates, due Friday19:58
EstimatorDone. 52 lines measured: dig, muck-away, drainage runs and concrete. Plant and tipping priced from your rates. 2 provisional sums flagged.20:14
XLSBill of quantities, groundworks.xlsx52 lines, NRM2Nothing gets submitted. That's your call.20:14
NexleyEstimator, online
YESTERDAY
EstimatorThe Riverside school package is due Friday at noon. Pack read: 3 questions for the architect drafted.16:30
Send them16:42
EstimatorSent. I'll measure as soon as revision B lands.16:42
TODAY
ZIPdrylining-pack.zip18 pages, 6 attachmentsPrice the partitions and ceilings, due Friday19:58
EstimatorDone. 38 lines measured: partitions by type and height, ceilings by area. Board and metal priced at your merchants, labour from your rates.20:14
XLSBill of quantities, drylining.xlsx38 lines, NRM2Nothing gets submitted. That's your call.20:14
£799 a monthStandard plan: all five assistants, no contract
7 days freeStarts with a 20-minute setup call
Runs in WhatsAppor Slack if you prefer
Your yesNothing goes out without it

Updated

In short

Nexley's Estimator is construction estimating software for UK subcontractors and small contractors. It reads a tender pack, measures the take-offs from the PDF drawings and builds a bill of quantities to NRM2, priced from your own labour and material rates.

It flags provisional sums where the pack is incomplete and drafts your questions for the architect. You check every line, set the margin and submit it yourself.

What the Estimator does

Tendering and estimating, handled.

Reads the whole pack

Drawings, spec, preliminaries and the pricing schedule. It lists every sheet and compares revisions.

Measures from the drawings

Quantities come off the PDFs, and each line links to the sheet it came from.

Prices from your rates

Your labour constants, your merchant prices and your allowances for access and attendances.

Structures it to NRM2

Proper work sections, in the format main contractors and their QS expect to open.

Flags the gaps

Provisional sums held where information is missing, with questions for the architect drafted in one email.

Drafts quality answers

On public sector and framework tenders, it drafts quality and social value answers from your real work, for you to edit.

How it works

From your message to done.

  1. Send the pack

    Forward it from your inbox, or drop the zip into the WhatsApp chat.

  2. The Estimator measures

    It takes off the quantities and links each line to its drawing.

  3. It prices from your rates

    Labour, materials, plant and your allowances, line by line.

  4. You check and submit

    You set the margin, change anything you like and submit it yourself.

Side by side

What changes.

A freelance QSNexley's Estimator
Cost per tenderAbout £1,200 + VAT, win or loseIncluded in £799 a month
Time to a priced billDays, behind the QS's bigger clientsBack the same evening
Your ratesTheirs, adjustedYours, line by line
Materials orderYou build it yourselfBuilt from the bill by the Buyer
Who submitsYouYou. Nexley never submits
It cost me 1,200 quid… and we didn't even win the jobs.”
W. Bendelow, WMB Construction

The Estimator is one of five assistants that share one WhatsApp chat. They hand work to each other, and you approve all of it in one morning message.

How the five work together

In detail

Tendering and estimating, in detail.

Nexley reads the tender pack — drawings, specification, preliminaries and the pricing document — measures the take-offs, and builds a bill of quantities structured to NRM2 and priced from your own labour and material rates, not a generic price book. Work that costs days of evenings, or an external QS fee on every bid, comes back to you the same day, ready for your review before anything is submitted.

  • NRM2-structured bills
  • Your own labour and material rates
  • You review before it goes out

Losing a tender should not cost you £1,200

Here is the sum that makes tendering brutal for subcontractors: you pay for the estimate whether or not you win the job. One contractor we work with paid an external quantity surveyor £1,200+VAT to measure and price a single tender — and the bid lost. That money is gone, and the next tender costs the same again. Price five tenders a quarter that way and the losing bids alone are a serious line in your accounts. Our guide to tender cost itemises one lost bid and has a calculator for your own numbers.

The alternative most firms choose is worse: the owner prices tenders at the kitchen table after the day's work, quantities get squeezed into whatever hours are left, and jobs that deserved a bid go unpriced because there was no time to measure them. Either way, the tendering function is the bottleneck between the business you have and the bigger contracts you want.

What Nexley actually does with a tender pack

You hand over the documents you were sent — drawing PDFs, the spec, the preliminaries, the employer's pricing schedule if there is one. From there:

  • Take-offs are measured from the drawings. Quantities come off the PDFs themselves, itemised so you can check any line against the drawing it came from. You can ask for a measure by voice from site if that is where you are. See take-offs and bills of quantities for how that works.
  • The bill is structured to NRM2 — proper work sections, measured quantities, provisional sums flagged where the information is incomplete, in the format main contractors and their consultants expect to open.
  • Pricing uses your rates, not a generic book. Your labour constants, your supplier prices, your allowances for access and attendances. Margin and risk stay your call — Nexley assembles, you decide.
  • Quality responses get drafted too. On public sector and framework tenders, up to 70% of the score can sit on quality and social value rather than price. Nexley drafts those responses from your real capability and track record, for you to edit and own.

What the Estimator measures, trade by trade

The method is the same for every trade: the pack goes in, every quantity is measured from a named drawing, and the bill is priced from your rates. What gets measured is not. Here is the first line of the bill for each trade.

TradeWhat it measuresFirst line of the bill
RoofingRoof areas per m² from the plans and sections, then perimeter, outlets and details as their own lines.Roof covering, 270 m², from drawing R-101.
ElectricalPoints counted off the lighting and power layouts, containment runs, boards, testing and certification.Twin switched socket outlets, 186 nr, from drawing E-201.
Plumbing and heatingPipework measured off the layouts, plant and radiators from the schedules at your merchants, commissioning.22 mm copper heating flow and return, 164 m, from drawing P-102.
GroundworksDig and cart away with bulking, drainage runs, concrete, then plant and tipping from your rates.Strip foundations, excavate and cart away, 86 m³, from drawing C-101.
DryliningPartitions by type and height, ceilings by area, board and metal priced at your merchants.70 mm stud partition, 2 x 12.5 mm board each side, 214 m², from drawing A-110.
Mechanical and electricalDuctwork, pipework and plant off the services drawings, priced at your suppliers, with RAMS and commissioning.Supply ductwork, 148 m, from drawing M-201.
ScaffoldingScaffold per m² of face, or by lift and bay, for the hire period, with loading bays and adaptations as their own lines.Independent tied scaffold, 640 m² of face, from elevation drawing A-201.
BricklayingFacing brick and blockwork per m², net of openings, with DPCs, wall ties and cavity closers counted.Facing brickwork in stretcher bond, 412 m², from elevation drawing A-202.

Each trade links to its tendering guide in Off the Tools, with worked examples, what to qualify, and where AI helps and where it doesn't. There are guides for 20 trades.

Can Nexley use my own labour and material rates?

Yes. Nexley prices every line of the bill from your own labour and material rates: your labour constants, your supplier prices and your allowances for access and attendances. It doesn't use a generic price book, and you check the finished bill before anything is submitted.

Whichever tool you use, check an AI price before it goes out. Our guide to what to check before using AI for tender pricing walks through the 8 checks.

Bid on more work without hiring an estimator

When the cost of pricing a tender falls to near zero, the maths of bidding changes. Tenders you would have declined for lack of time become worth an hour of review. JCT and NEC packages that felt too document-heavy stop being intimidating, because the document burden is exactly the part that is handled. For M&E packages, where the tender also wants RAMS and a commissioning plan, see M&E estimating software. Firms stuck at the size one owner can price can finally chase the larger contracts — without the salary, the recruitment, or the wait. Smaller jobs that need a quick price rather than a full tender go through automated construction quoting instead: a branded quote from your own price list, sent the same day.

Time is the other squeeze. In the Nexley Tender Clock, our study of 581 UK construction tenders, main contractors gave subcontractors a typical 12 days to price a package. Starting from a priced draft is what makes a window that short workable.

Nexley is one flat monthly plan with a 7-day free trial, and tendering is one of four jobs it covers — see pricing for the whole plan, or the honest comparison with hiring a quantity surveyor if that is the decision on your desk.

Book a 20-minute demo

Where firms feel it first

Three places the tendering workload bites, and what changes.

The failed-bid bill

External estimating fees land win or lose. In-house tendering on a flat monthly plan means a lost bid costs you the hour you spent reviewing it — not a QS invoice.

The real cost of tendering →

The evening estimate

Measuring drawings after a day on the tools is how errors creep into quantities. Machine-measured take-offs give you checked numbers to review with a fresh head.

How take-offs work →

The tenders you never priced

Every unpriced tender is a job someone else won unopposed. When pricing capacity stops being the constraint, your bid rate — and your pipeline — is your choice again.

Winning social housing tenders →

Off the Tools: free guides

Guides on tendering and estimating

57 more guides
All free guides

Standard plan

£799 a month

All five assistants, the Estimator included. Accounting connections included. No contract, and the first 7 days are free.

Got questions? We have answers

Or skip the reading. Someone who knows the trade picks up.

0800 193 8828Message us on WhatsApp
Yes. It prices every line from your own rates and your merchants' prices, not a generic price book.

Send your first voice note tonight. Wake up to it done.

Starts with a 20-minute setup call. 7 days free, then £799 a month. Cancel any time.

More ways owners go officeless

Pick the one that sounds like you.

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us