AI tendering for flooring contractors

Price a flooring tender per m² of each finish, with waste worked out from the room layouts and roll or tile sizes, then price subfloor preparation, coving, trims and phasing as separate lines. Never assume the subfloor is dry. If the pack has no moisture readings, carry a surface damp-proof membrane as a provisional sum or exclude it.

What makes flooring tenders hard to price?

The finishes schedule tells you what goes down; the subfloor decides what it costs and whether it stays down. A refurbishment package might carry sheet vinyl in clinical rooms, carpet tiles in offices and LVT in reception, each over a different base.

The problems that come up on most flooring packages:

  • Waste from layouts. Sheet vinyl comes in fixed roll widths, so narrow rooms and corridors waste far more than open floors.
  • Subfloor preparation. Priming, smoothing, levelling and repairs vary with every base, and the pack rarely says what's there.
  • Moisture. New screeds take time to dry, and laying on a wet base causes most flooring failures. The adhesive maker Instarmac cites figures from FITA that 85% of complaints result from moisture.
  • Specified products and substitutions. A named product may be discontinued, on long lead time, or chosen for a slip or fire rating.
  • Phasing in occupied buildings. Schools, surgeries and offices that stay open mean several visits, out-of-hours work and furniture moves.

How do you price a 480 m² flooring package?

Work out the order quantity per finish from the layout, price each finish per m², then add preparation, coving and phasing. Carry the moisture risk as its own line.

Worked example

A 480 m² GP surgery refurbishment, four phases, surgery open

180 m² of welded sheet vinyl with coved skirting in clinical rooms, 300 m² of carpet tiles in offices and corridors. Existing sand-cement screed. No moisture readings in the pack.

Sheet vinyl ordered, roll-width waste180 m² × 1.15207 m²
Carpet tiles ordered300 m² × 1.05315 m²
Sheet vinyl, supplied, laid and welded180 m² × £38£6,840
Carpet tiles, supplied and laid300 m² × £27£8,100
Prime and 3 mm smoothing compound480 m² × £9.50£4,560
Coved skirting, clinical rooms140 m × £14£1,960
Phasing: three extra mobilisations3 × £210£630
Tender price£22,090
Provisional sum: surface DPM if readings exceed 75% RH480 m² × £11£5,280
Rates include waste and margin and are illustrative. Use your own supplier prices and outputs.

The provisional sum is the point of this example. The surface DPM is worth 24% of the tender price. Price it in and you're dearer than the bidder who left it out; leave it out and find a wet screed, and the job loses money. Carrying it as a provisional sum, triggered by a test, keeps you competitive and protected.

For the per-m² rate itself, start from your fitters' day cost and output.

Calculator: Day rate to price per m²
£
m²
£
%
%
Price per m²–

Your numbers, not a promise. Change any figure to match your firm.

A two-fitter team costing £420 a day, laying 40 m² of LVT with £22 a m² of materials and 7% waste, needs about £41.51 a m² at an 18% margin. See converting a day rate to a price per m² for the method.

Who is responsible for the subfloor?

Whoever the tender says, and if it says nothing, assume it will be argued to be you. Settle it before you price, because preparation and moisture control can add a quarter to the package.

Quick check: Who is responsible for the subfloor?
Does the pack say who prepares the subfloor: main contractor, screeder or flooring contractor?
Is it the flooring contractor?
Does the pack give moisture readings and a surface regularity class?
Will the subfloor be handed over tested, dry and to a stated regularity?
Price the preparation to the stated base

Price priming, smoothing and repairs for the readings given, and state the readings and date you priced from.

Price prep, and carry moisture control as a provisional sum

Include standard preparation. Carry a surface DPM as a provisional sum, triggered by readings above the limit in the product's data sheet.

Price from a handed-over base

State that you'll test on handover and won't lay on a base that fails. Remedial work is a variation.

Ask before the clarification deadline

Send a numbered question asking who prepares, tests and signs off the subfloor. If there's no answer, qualify it.

Manufacturers' own specifications go further. One resin flooring specification sets 75% RH maximum before laying, tested to BS 8203 Annex A with drying aids removed at least four days before the test, and readings at corners, edges and across the area. It also names surface regularity classes from BS 8204 and a minimum surface strength. If your tender says "subfloor by others", ask for those results at handover.

Can you substitute the specified floor?

Only with written approval, and only with a product that matches every rating the spec relies on. Floors are often chosen for slip resistance, fire performance or wear, and the substitute has to match all of them.

Slip resistance matters most in wet areas. HSE says a workplace floor "must be suitable for the type of work activity taking place on it", and that people should be able to walk on floors likely to be contaminated without the risk of slipping. If a clinical room or kitchen is specified with a safety floor, an alternative with a lower slip rating can leave you holding the risk. Put any substitute in your tender as a priced alternative, with its data sheet, beside the specified product.

What should a flooring tender qualify?

Moisture, preparation, protection and phasing, because the main contractor controls all four and each one moves your cost.

Flooring tender qualifications
Tender: project, floor finishes package
Our price: £amount excluding VAT, dated date

Basis of price
1. Priced from finishes schedule reference, revision and drawings numbers, revisions. Areas measured net; waste allowed for roll widths and layouts.
2. Products priced as specified: products. Alternatives offered separately with data sheets.

Subfloor and moisture
3. Subfloor to be handed over clean, sound, dry and to surface regularity class by others. We will test on handover in line with BS 8203 and the product data sheet.
4. Surface DPM carried as a provisional sum of £amount, to be instructed if readings exceed 75% RH.
5. Levelling beyond 3 mm smoothing compound, screed repairs, and removal of existing adhesives or coverings are excluded unless listed.

Protection and phasing
6. Protection of finished floors after handover of each area is by others.
7. Price based on number phases and number visits during normal hours. Additional phases, out-of-hours work or return visits charged at £rate per visit.
8. Rooms to be clear of furniture, equipment and other trades before we start. Furniture moves excluded unless listed.

Conditions
9. Areas heated to the product's installation temperature for 48 hours before, during and after laying, by others.
10. Price valid for 30 days. Products subject to supplier price changes after that date.

The general lines on design, attendances and payment are in the tender qualifications and exclusions template.

What can AI do on a flooring tender, and what can't it?

AI handles the measuring and reading well. It can't tell you what's under the existing carpet.

What AI does well:

  • Room areas and order quantities from plans, room by room, with roll-width cut plans and waste worked out per room rather than one flat figure. See can AI do a take-off from drawings.
  • Reads the finishes schedule against the spec and flags a discontinued product, a missing slip rating or a finish that doesn't suit the base.
  • Finds the subfloor and phasing clauses buried in the prelims and the subcontract order.
  • Drafts qualifications from your standard list with this tender's references.
How it looks in Nexley

The Tenders assistant reads a surgery refurbishment pack and carries the moisture risk as a provisional sum.

What still needs the flooring contractor:

  • The base. Whether the existing screed is sound, how much levelling it needs, and what's left of old adhesive.
  • Readings. Only a meter on site tells you the moisture.
  • Output. How fast your fitters lay in a surgery that stays open.
  • The decision on what to qualify, what to allow and whether to bid.

How do you win more flooring tenders?

Make your price clean, specific and easy to compare, with the risk carried openly rather than hidden.

  • Show your waste. A take-off with roll widths and cut plans looks like work done properly.
  • Use provisional sums for moisture instead of pricing the worst case.
  • Offer alternatives separately, never as the main price.
  • Drop packs you can't win after a 10-minute read.

Fit-out firms can see how this works for their trade on the fit-out trade page.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

For flooring tenders, Nexley reads the pack you forward on WhatsApp, measures each room from the plans with waste for roll widths and tile sizes, checks the finishes schedule against the spec, and drafts a priced schedule from your m² rates with moisture and phasing qualifications. You check the base on site and approve the price.

Common questions

How much waste should I allow on a flooring tender?

Work it out from the layout. Carpet tiles in open rooms might need 3 to 5%, while sheet vinyl in narrow rooms and corridors can need 15% or more because of roll widths. A take-off with cut plans per room is more accurate than any flat figure.

What moisture reading is too high for flooring?

A reading above 75% RH on a concrete or screed base is higher than recommended for laying without a surface DPM, measured with a BS hygrometer. Wood subfloors have a lower limit. Always check the product's data sheet.

Should I price moisture control into my rate?

Not if you can avoid it. Pricing a DPM on every job makes you dear against bidders who don't. Carry it as a provisional sum, triggered by test results, and say so clearly.

Who protects the floor after it's laid?

Agree it in the tender. Most packages make protection after handover the main contractor's job, but if your tender says nothing, damage by other trades can end up as your defect.

Sources

  1. Instarmac: How do you test for moisture?
  2. Altro: NBS M12 specification for AltroStat SD (via SpecifiedBy)
  3. HSE: Slips and trips, flooring

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Tendering and estimating

Keep reading

Tendering and estimating

AI tendering for roofers

Roof tenders are won and lost on the rate per square metre and the risks hidden behind it. This guide prices a 420 m² flat roof line by line, gives you a quick check for per m² or per day, a calculator and a qualifications list to copy.

29 Oct 2026, 9 min read, Kade Dillon

Tendering and estimating

AI tendering for electricians

Electrical tenders are priced point by point, but the money is lost in what the points leave out. This guide works through a 1,200-point take-off, a quick check on design responsibility, a price-per-point calculator and clarifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Tendering and estimating

AI tendering for dryliners

Drylining tenders are priced per m² of partition, but the risk sits in the system spec. This guide prices a 380 m² partition package, gives a quick check on substituting the specified system, a calculator and qualifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
I had a quick demo and we’ve never looked back. Nexley works, it’s simple, and we’re really happy. Just give it a try.”
— Pete Charley

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us