AI tendering for groundworkers and civils contractors

Price a groundworks tender from the bill of quantities or your own take-off: excavation by bank volume, cart away by loose volume after bulking, then concrete, drainage and attendances, each with its plant, labour and tipping costs. Then settle who carries the ground risk. AI can check the bill and the volumes quickly; you judge the ground.

What makes groundworks tenders hard to price?

Most of the cost is underground and not on the drawings. A groundworks package from a main contractor usually comes with a bill of quantities, a drainage layout, foundation details and a site investigation report, if you're lucky. The bill tells you the quantities. It doesn't tell you what the ground will do.

The problems on most groundworks tenders:

  • Bulking. A cubic metre in the ground is more than a cubic metre in the lorry.
  • Spoil classification. Inert, non-hazardous or contaminated, each with a different tipping cost.
  • Unknown ground. Soft spots, obstructions, water, deeper foundations than drawn.
  • Buried services. Not always shown, always your risk if you hit them.
  • Attendances and access. Haul roads, wheel wash, welfare and who provides them.
  • Payment and retention. Long terms, retention and pay-when-paid wording on a cash-heavy trade.
  • Paperwork. RAMS for excavations and confined spaces, and CIS on your own subbies.

A groundworks firm on paper is pricing every bill line, chasing every supplier and writing every RAMS by hand. The pricing method below works on paper too, but the arithmetic is exactly the part worth handing over.

How do you price dig and cart away?

Measure the excavation in the ground (bank volume), then apply a bulking factor to get the loose volume you're carting. Price lorry loads on the loose volume, never the bank volume.

Worked example

Strip foundations for four houses, clay, cart away to tip

Foundation trench 186 m long, 600 mm wide, 1 m deep. Clay, bulking taken at 30%, the middle of the usual range. Muck-away lorry carrying 12 m³ loose at £340 a load (check with your haulier).

Bank volume186 m × 0.6 m × 1.0 m111.6 m³
Loose volume after bulking111.6 m³ × 1.30145.1 m³
Lorry loads, priced on loose volume145.1 ÷ 12 = 12.1, round up13 loads
Cart away priced correctly13 × £340£4,420
Lorry loads if priced on bank volume111.6 ÷ 12 = 9.3, round up10 loads
Cart away priced on bank volume10 × £340£3,400
Shortfall on one trench£4,420 − £3,400£1,020
Lorry capacity and tip rate are illustrative. Excavation plant and labour are priced separately. If the spoil is classed as contaminated, the tip rate changes completely, so qualify it.

Published bulking figures put clay at 20 to 40%, sand and gravel at 20 to 30%, and rock at 40 to 80%. Use the site investigation to pick the figure, and use the top of the range when the ground is wet clay or the report is thin.

Price those inspections, trench support and service location into the job: they're time on every shift. For deep manholes and chambers, see confined space work for groundworkers.

Who carries the ground risk?

Whoever the contract says, and on many subcontracts that's you unless you qualify it. Look for wording that you're "deemed to have satisfied yourself" about ground conditions, and check whether a site investigation report is in the pack.

Quick check: Who carries the ground risk?
Is there a site investigation report in the tender pack?
Does the subcontract say you're deemed to have satisfied yourself about ground conditions?
Can you price the risk in the report (water, soft spots, contamination) with confidence?
You carry it, and you've priced it

Price the risks the report shows, and state the report reference your price is based on.

Ground risk is shared or with the client

Price to the report, and state that conditions different from it will be valued as a variation.

Qualify it or don't bid

Without a report, price stated assumptions (ground type, water level, no obstructions) and list them. If the contract won't accept qualifications, price the risk or walk away.

What should a groundworks tender qualify?

Ground conditions, spoil, water and services, first. Then attendances and payment.

Groundworks tender qualifications
Tender: project name, groundworks package
Our price: £amount excluding VAT, dated date

Ground
1. Price based on site investigation report reference. Conditions differing from the report will be valued as a variation.
2. Excavation in ground type, assumed free of obstructions, old foundations and soft spots. Breaking out and extra depth at £rate per m³.
3. Foundations priced to depths shown on drawing. Additional depth instructed by building control at our schedule rates.

Spoil
4. Cart away priced as inert spoil to licensed tip. Non-hazardous, contaminated or hazardous spoil, testing and classification excluded.

Water
5. Dewatering beyond pumping from excavations with number submersible pumps excluded.

Services
6. Existing services located and marked by others before we start. Diversion, protection and damage to unrecorded services excluded.

Site
7. Haul roads, wheel wash, welfare and security by the main contractor unless listed.

Payment
8. Monthly applications; payment within number days. Retention not accepted / accepted at x%, half released at practical completion.
9. VAT and CIS applied as required by HMRC. CIS deducted from labour only, not from materials or plant hire we pay for directly.

On payment, a clause making your payment conditional on the main contractor being paid by the client is ineffective under section 113 of the Housing Grants, Construction and Regeneration Act 1996, unless the party upstream is insolvent. Northern Ireland has its own construction contracts legislation, so check it there. For the wider picture, see main contractor payment terms.

What can AI do on a groundworks tender, and what can't it?

AI is good at checking the bill and doing the volumes; it's no use on what's under the topsoil.

How it looks in Nexley

A groundworker forwards a main contractor's bill and gets the checks back before pricing.

What it does well:

  • Checking the bill. Recomputing volumes from the drawings and flagging quantities that don't match.
  • Bulking and loads. Turning bank volumes into loose volumes and lorry loads.
  • Reading the SI report for water levels, made ground and contamination flags.
  • Drafting qualifications and RAMS starting points from your standard documents. See can AI write RAMS.

What still needs you:

  • The ground. What the report means on this site, and how much to allow.
  • Plant and method. Which machine, how many days, where the spoil goes.
  • Risk pricing. Whether to carry the ground risk and for how much.
  • Sign-off on the price and the qualifications.

Which groundworks tenders should you bid?

The ones with a site investigation, a clear bill and payment terms your cash can carry. Use the 10-minute tender read and walk away from packs with no SI report and a "deemed satisfied" clause, or a retention and payment term that would leave you funding the job. For how Nexley works for groundworks firms more widely, see the groundworks and civils trade page.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

For groundworks tenders, you forward the bill, drawings and SI report on WhatsApp and Nexley checks the quantities against the drawings, works out bulking and lorry loads, prices the bill from your rates, flags ground, spoil and services risks and drafts your qualifications. You set the plant, the method and the risk, and approve the price.

Common questions

What bulking factor should I use for clay?

Published figures put clay at 20 to 40%. Use the site investigation and your experience of the area, and lean high in wet clay.

Should I price cart away per m³ or per load?

Per load, worked out from the loose volume, then convert to a bill rate per m³ of bank volume if the bill asks for it. That way the bulking is inside the rate.

Can I refuse pay-when-paid terms?

Pay-when-paid clauses are ineffective under the Construction Act unless the party upstream is insolvent. Point to section 113 if a subcontract includes one, and take advice on anything unusual.

Who pays for hitting an unmarked service?

It depends on the contract and whether you took reasonable steps. Qualify that services are located by others, and follow HSE guidance on locating them before digging.

Sources

  1. HSE: Excavations
  2. Engineering ToolBox: Soil and rock bulking factors
  3. legislation.gov.uk: Housing Grants, Construction and Regeneration Act 1996, section 113
  4. GOV.UK: CIS contractors, make deductions and pay subcontractors

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Tendering and estimating

Keep reading

Tendering and estimating

AI tendering for roofers

Roof tenders are won and lost on the rate per square metre and the risks hidden behind it. This guide prices a 420 m² flat roof line by line, gives you a quick check for per m² or per day, a calculator and a qualifications list to copy.

29 Oct 2026, 9 min read, Kade Dillon

Tendering and estimating

AI tendering for electricians

Electrical tenders are priced point by point, but the money is lost in what the points leave out. This guide works through a 1,200-point take-off, a quick check on design responsibility, a price-per-point calculator and clarifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Tendering and estimating

AI tendering for dryliners

Drylining tenders are priced per m² of partition, but the risk sits in the system spec. This guide prices a 380 m² partition package, gives a quick check on substituting the specified system, a calculator and qualifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
Nexley saves me so much time it’s unbelievable. Was sceptical at first but when I saw what it can do for my business I couldn’t sign up quick enough. Can’t recommend highly enough.”
— Jonny Monk

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us