Tendering and estimating, 29 October 2026

AI tendering for painters and decorators

Price a decorating tender by measuring wall, ceiling and woodwork areas from the drawings, applying the system on the finishes schedule to each surface, and pricing per m² from your gang's output and paint per m². Add mist coats, doors and frames, access and return visits as separate lines. AI measures the rooms; you judge the prep.

What makes decorating tenders hard to price?

Painting is the last trade in, so it inherits everyone else's delays and damage. A decorating package arrives as floor plans, a finishes schedule and a spec naming a paint system, and the main contractor wants a rate per m² or a lump sum. What the documents don't show is the state of the surfaces when you arrive.

The problems on most decorating tenders:

  • Measuring. Walls aren't drawn as areas, so they must be worked out from plans and heights.
  • Finishes schedules. One system for walls, another for ceilings, another for woodwork, by room.
  • Prep standard. "Prepare surfaces" can mean a light sand or days of filling.
  • Mist coats on new plaster, often missing from the schedule.
  • Return visits. Snagging, touch-ups after M&E, out-of-sequence rooms.
  • Access to stairwells, atriums and high ceilings.
  • Occupied buildings and maintenance contracts, with working hours and protection.

How do you measure and price a decorating package from the drawings?

Work out wall area room by room from the perimeter and height, take off the openings, then price per m² for each system. Add mist coats, doors and frames as their own lines.

Worked example

An office floor: 14 offices and 96 m of corridor, walls only

Offices 4.2 × 3.6 m, ceilings 2.7 m high, suspended ceilings by others. Corridor walls newly plastered. Emulsion, two coats, from the finishes schedule.

One office(4.2 + 3.6) × 2 × 2.7 m, less a 1.9 m² door40.22 m²
Fourteen offices14 × 40.22 m²563.08 m²
Corridor walls96 m × 2 sides × 2.7 m, less 30 doors × 1.9 m²461.4 m²
Total wall area1,024 m²
Walls, two coats1,024 m² × £12.52£12,820
Mist coat to new plaster in corridors461 m² × £3.10£1,429
Doors, frames and architraves, both faces30 × £45£1,350
Tender price£15,599
The £12.52 rate comes from the calculator below at its starting figures: £480 a day, 60 m² a day, £2.40 a m² of materials, 10% waste and a 15% margin. Mist coat and door rates are illustrative. Return visits beyond two, and decoration after others' damage, are excluded and listed in the qualifications.
Calculator: Day rate to price per m²
£
m²
£
%
%
Price per m²–

Your numbers, not a promise. Change any figure to match your firm.

Sixty m² a day for two decorators putting two coats on clear office walls is a different output from a stairwell with cut-ins at every landing. Run the calculator for each system and each kind of space.

Can you price the painting from the finishes schedule alone?

Sometimes, on new build with measurable drawings and a full system per surface. On refurbishment, rarely: the schedule tells you the finish, not what's under it.

Quick check: Can you price the painting from the finishes schedule alone?
Does the schedule give a full system per surface (prep, primer or mist coat, number of coats, product)?
Can you measure every surface from plans, sections or room heights?
Is it new work, with no existing paint to prepare?
Yes, price from the schedule

Measure each surface, price each system and state the schedule revision your price is based on.

Visit before you price

Existing surfaces decide the prep. Check condition, and the age of the paintwork in case it contains lead. If you can't visit, qualify the prep standard you've priced.

Clarify first

Ask for the missing systems or heights before the deadline. Without them you're guessing the coats or the area.

On older buildings, prep can carry a health risk as well as a cost. HSE says lead pigments were widely used in paints until the 1960s and weren't removed from all commonly used paint until the early 1980s, so lead can be found under newer paintwork. It recommends leaving sound paintwork in place where it's covered by newer paint, and using methods that limit dust and fume, such as chemical strippers or wet abrasive paper and a scraper. Price the method, or exclude the work.

What should a decorating tender qualify?

Prep standard, return visits, access and colour changes. Those are where decorating packages lose money.

Decorating tender qualifications
Tender: project name, decorating package
Our price: £amount excluding VAT, dated date

1. Priced from drawings numbers and finishes schedule reference and revision, systems as listed: list by surface.
2. Prep priced as light sand, fill minor defects and spot prime. Making good of damage by others, cracks wider than mm mm and replastering excluded.
3. Mist coat to new plaster included where shown. Plaster assumed dry and sound before decoration starts.
4. Price includes number visits per area: main decoration and number return visits for touch-ups. Further visits at £rate per visit.
5. Colours as schedule reference. Colour changes after ordering, and feature walls not shown, at our rates.
6. Access by stepladders and towers up to m m working height. Scaffolds, MEWPs and access to stairwells and atriums beyond this excluded unless listed.
7. Working hours hours, days. Out-of-hours working in occupied areas at our rates.
8. Existing paintwork assumed free of lead. If lead paint is found, preparation will be agreed and valued separately.
9. Protection of floors and fittings by dust sheets included. Floor protection boards by others.
10. Price valid for number days.

For the general wording rules, see tender qualifications and exclusions. On maintenance contracts and framework bids for councils and housing associations, quality answers often carry as much weight as price: see quality vs price scoring.

What can AI do on a decorating tender, and what can't it?

AI is good at measuring rooms and reading schedules; it can't see the walls.

How it looks in Nexley

A decorator forwards a fit-out pack and gets the measured areas and gaps back.

What it does well:

  • Measuring rooms from scaled plans and stated heights, room by room.
  • Reading finishes schedules and matching systems to surfaces.
  • Spotting gaps: no mist coat on new plaster, rooms missing from the schedule, programme clashes.
  • Drafting qualifications from your standard list.

What still needs you:

  • Prep. The state of the walls when you arrive.
  • Output. Your gang's speed on this building.
  • Lead and old surfaces, and the method you'll use.
  • Sign-off on the price and the qualifications.

Which decorating tenders should you bid?

Ones with a full finishes schedule, a sensible programme between plastering and painting, and a limit on return visits you can price. Use the 10-minute tender read, and walk away from packages that want "all making good" in a fixed sum, or unlimited touch-ups until handover. For how Nexley works for fit-out and finishing trades more widely, see the fit-out trade page.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

For decorating tenders, you forward the drawings, finishes schedule and programme on WhatsApp and Nexley measures walls, ceilings and woodwork room by room, matches each surface to its system, flags missing mist coats and programme clashes, and drafts a price from your rates per m² with your qualifications. You set the prep and the output and approve the price.

Common questions

How do you work out wall area for a painting tender?

Room perimeter × ceiling height, less doors and windows, for each room. Add the rooms up by system.

Should a mist coat be priced separately?

Yes, as its own line. It's an extra coat on new plaster, and schedules often leave it out.

How many return visits should a decorating price include?

State a number, often one or two, and a rate per visit after that. Unlimited touch-ups until handover is an open-ended risk.

Do I need to worry about lead paint on a refurbishment?

On older buildings, yes. HSE says lead was widely used in paint until the 1960s and not removed from all common paints until the early 1980s. Price a safe prep method or qualify it.

Sources

  1. HSE: Construction hazardous substances, lead
  2. Dulux: Dr Dulux, painting on new plaster

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Tendering and estimating

Keep reading

Tendering and estimating

AI tendering for roofers

Roof tenders are won and lost on the rate per square metre and the risks hidden behind it. This guide prices a 420 m² flat roof line by line, gives you a quick check for per m² or per day, a calculator and a qualifications list to copy.

29 Oct 2026, 9 min read, Kade Dillon

Tendering and estimating

AI tendering for electricians

Electrical tenders are priced point by point, but the money is lost in what the points leave out. This guide works through a 1,200-point take-off, a quick check on design responsibility, a price-per-point calculator and clarifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Tendering and estimating

AI tendering for dryliners

Drylining tenders are priced per m² of partition, but the risk sits in the system spec. This guide prices a 380 m² partition package, gives a quick check on substituting the specified system, a calculator and qualifications to copy.

29 Oct 2026, 8 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
Nexley saves me so much time it’s unbelievable. Was sceptical at first but when I saw what it can do for my business I couldn’t sign up quick enough. Can’t recommend highly enough.”
— Jonny Monk

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us