Site-specific RAMS without two hours a job: working from a master template

To write RAMS quickly, keep one master risk assessment and method statement for each task you repeat, and write only a one-page site sheet per job: address, access, hazards particular to that site, people and emergency details. HSE says a method statement for a repeated task "will be similar from job to job". Done this way, a site-specific RAMS takes about 20 minutes, not two hours.

What has to be in a RAMS by law?

The law asks for a risk assessment. A method statement is required in writing only for some work. "RAMS" is the industry's name for putting the two together, and main contractors usually ask for one before you start.

Every employer must assess the risks to staff and anyone affected by the work. If you employ five or more people, you must record the significant findings: the hazards, who might be harmed and how, and what you're doing to control the risks. HSE's construction pages say written method statements are a legal requirement for demolition, dismantling or structural alteration, and recommend them for other work as a way to plan and brief the job.

With fewer than five staff, you still have to assess the risks. Writing them down is how you prove it when a main contractor, a council or an inspector asks.

Why do RAMS take two hours a job?

Because most people start from a blank page or the last job's document, and rewrite all of it. The task steps, PPE list, training records and standard controls for a 30-metre fence line are identical in Bracknell and Basingstoke. Only the site changes.

It takes me a couple of hours… for every job.
Builder, hard landscaping and brickwork, brother plus an apprentice, Moving into public sector work

That builder was writing RAMS and construction phase plans from scratch for each job as he moved into council work. The same goes for a firm whose commercial clients ask for RAMS on every site, often at short notice: each one can eat an evening.

How do you split a RAMS into a master and a site sheet?

Divide every heading into one of two piles: things that are true every time you do this task, and things that depend on where you're doing it. The first pile is the master. The second is the site sheet.

Master RAMS headings: copy once per task
MASTER (write once per task, review yearly)
1. Task: e.g. Laying block paving driveway up to 100 m²
2. Scope: what this master covers and what it doesn't e.g. excludes excavation deeper than 1.2 m
3. Sequence of work: numbered steps from setting out to handover
4. Hazards for each step, who could be harmed, and how
5. Standard controls for each hazard (eliminate, reduce, isolate, PPE)
6. Plant and tools, with inspection checks before use
7. Hazardous substances and COSHH controls e.g. cement, cutting dust: wet cutting, extraction, FFP3 masks
8. PPE required for the task
9. Training and cards required e.g. CSCS, CPCS for plant, abrasive wheels
10. Welfare arrangements (standard)
11. Waste and housekeeping
12. Version number, date, author, review date

SITE SHEET (one page per job)
A. Site address, client, main contractor and site contact
B. Dates and working hours
C. Who's on site from your firm, with cards held
D. Access, parking, deliveries and storage
E. Site-specific hazards not in the master e.g. overhead power line, school next door, slope, shared drive
F. Extra controls for those hazards
G. Services: located how, and by whom e.g. CAT scan, utility drawings
H. Asbestos: survey seen? Results shared?
I. Nearest A&E, first aider, first aid kit location
J. Emergency and fire arrangements on this site
K. Client or main contractor site rules
L. Signed by everyone briefed, with date

The master is where you put the effort. Write it with your team, against the HSE guidance for the task, and keep it in one place with a version number. The site sheet is what makes the RAMS site-specific, and it's the part a main contractor will read first.

How much time does a master template save?

On a firm writing a RAMS for most jobs, it adds up to weeks a year.

Worked example

Two-person builder writing 40 RAMS a year

Before: every RAMS written in full. After: masters for the four tasks that make up most jobs, plus a site sheet per job.

RAMS written from scratch40 jobs × 2 hours80 hours
Writing four masters, once4 tasks × 3 hours12 hours
Site sheets40 jobs × 20 minutes13.3 hours
Time in the first year with masters12 + 13.325.3 hours
Time saved in year one80 − 25.354.7 hours
Assumes four repeated tasks and 20 minutes per site sheet. From year two, only reviews and site sheets remain: about 15 to 17 hours.

Fifty-odd hours is more than a working week, and it usually comes out of evenings.

When must you change the master, not only the site sheet?

When the task itself changes. HSE says a method statement for a repeated operation will be similar from job to job, but where circumstances change markedly it should be revised for each job. A new piece of plant, a new material, a different sequence or a lesson from an incident all mean updating the master and its version number.

  1. After any accident or near miss.

    Find what the master missed and add the control.

  2. When you change how you do the task.

    New plant, materials or sequence.

  3. When guidance changes.

    HSE updates its pages; check yearly.

  4. When the site doesn't fit the master.

    Demolition, structural alteration, confined spaces or deep excavation need their own full RAMS, not a site sheet.

  5. Once a year anyway.

    Review the date, the training list and the cards.

For roof work, HSE's guidance is blunt: all work on roofs is highly dangerous, even if a job only takes a few minutes, and must be planned. Treat every roof as fragile until a competent person says otherwise. That belongs in the master for any roofing task, and the edge protection for each house belongs on the site sheet.

How does this fit with a construction phase plan?

On most small jobs you need both. The construction phase plan covers the whole job: who's on site, welfare, the main dangers and how they're controlled. The RAMS covers each task in detail. Your masters can feed straight into the plan's "main dangers" section. See our construction phase plan template, and the free RAMS template if you want a starting layout for the master.

If you're unsure whether a task needs specialist controls, such as asbestos, confined spaces or structural work, get a competent health and safety adviser to write or check that master. One heating and air conditioning firm we spoke to pays a health and safety consultant £135 a month for this kind of support.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

Nexley keeps your RAMS masters and drafts the site sheet for each job from what you send it on WhatsApp: the address, a voice note on access and hazards, photos of the site. You get a complete RAMS back to check, correct and sign before it goes to the main contractor. You stay the competent person; Nexley does the typing.

Common questions

Do I need a RAMS for every job?

You need a risk assessment for every job, and if you employ five or more people you must record the significant findings. A written method statement is legally required for demolition, dismantling and structural alteration. Most main contractors and councils ask for a RAMS on every job anyway.

Can I use a generic RAMS?

A generic master is fine as the base, and HSE accepts that method statements for repeated tasks will be similar from job to job. It must be made site-specific with the hazards, access, people and emergency arrangements for that site.

How long should a RAMS be?

As long as the risks need. A short, specific RAMS that the team has read beats a 30-page document nobody opens. Main contractors on larger commercial jobs may ask for more detail.

Who should sign the RAMS?

The person who wrote it, and everyone who has been briefed on it before starting work. Keep the signed copy with the job file.

Sources

  1. HSE: Steps needed to manage risk
  2. HSE: Construction administration (risk assessments and method statements)
  3. HSE: Roof work
  4. HSE: Are you a small builder?

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Safety, certificates and compliance

Keep reading

Safety, certificates and compliance

Construction phase plan for small jobs, with a template

Under CDM 2015, the builder writes the construction phase plan on most small jobs, before work starts. This guide gives a fill-in template based on HSE's own, a worked example for a kitchen extension, and a quick check on notification.

29 Oct 2026, 8 min read, Kade Dillon

Safety, certificates and compliance

F-gas certification for air conditioning installers

Installing split air conditioning means working on a refrigerant circuit, and that needs two certificates: one for the engineer and one for the business. This guide has a quick check for which you need, Refcom's fees worked out per year, and what electricians can and can't do.

29 Oct 2026, 7 min read, Kade Dillon

Safety, certificates and compliance

Landlord EPC upgrades: what electricians and heating engineers can offer

Private landlords have until 1 October 2030 to bring rented homes up to EPC C, and work done since 1 October 2025 already counts. This guide sets out the rules, works through the £10,000 cap with a heat pump grant, and lists what electricians and heating engineers can offer.

29 Oct 2026, 6 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
I had a quick demo and we’ve never looked back. Nexley works, it’s simple, and we’re really happy. Just give it a try.”
— Pete Charley

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us