Safety, certificates and compliance, 29 October 2026

Electrical certificates: EIC, EICR, minor works and what to keep

An Electrical Installation Certificate (EIC) certifies new work: a new installation, a new circuit or a replacement consumer unit. A Minor Electrical Installation Works Certificate covers additions and alterations that don't add a circuit, like an extra socket. An Electrical Installation Condition Report (EICR) is not a certificate at all: it reports on an existing installation. Keep a copy of each with the job.

What's the difference between an EIC and an EICR?

An EIC says new work you did meets BS 7671. An EICR says what condition someone else's existing installation is in. You issue an EIC when you install; you issue an EICR when you inspect.

The IET's model forms make the split clear. The EIC is for a new installation, or an addition or alteration that introduces new circuits or replaces a consumer unit or distribution board. It is not for periodic inspection, which needs an EICR. The EIC is only valid with its Schedule of Inspections and Schedule of Test Results attached.

The EICR's job is to confirm, as far as reasonably practicable, whether the installation is in a satisfactory condition for continued service. Each observation gets a code:

CodeMeaningEffect on the report
C1Danger present, risk of injuryUnsatisfactory. Urgent remedial work.
C2Potentially dangerousUnsatisfactory. Remedial work as a matter of urgency.
C3Improvement recommendedDoesn't make it unsatisfactory
FIFurther investigation required without delayUnsatisfactory until investigated

The IET's current model forms are for BS 7671:2018+A4:2026. Use the forms that match the edition you designed and tested to.

When can you use a minor works certificate?

When the job adds to or alters an existing circuit without providing a new one. The IET form's own guidance gives examples: adding socket outlets or lighting points to an existing circuit, or moving a light switch. It can also cover replacing accessories or light fittings.

It can't be used for replacing a distribution board or consumer unit, and it isn't right if the customer asked for more extensive work. Then you issue an EIC.

Quick check: Which certificate does this job need?
Are you inspecting an existing installation rather than doing new work?
Does the job add a new circuit, or replace a consumer unit or distribution board?
Is it an addition or alteration to an existing circuit, or replacing accessories or fittings?
Electrical Installation Condition Report

Code every observation C1, C2, C3 or FI. Any C1, C2 or FI means an unsatisfactory overall result.

Electrical Installation Certificate

With the Schedule of Inspections and Schedule of Test Results. If it's notifiable work in a home, you also need Building Regulations sign-off.

Minor Electrical Installation Works Certificate

If the work is in a bathroom or shower area in a home in England, it is still notifiable under Part P even though no circuit is added.

Which jobs also need Building Regulations sign-off?

In a home in England, three kinds of work are notifiable under Approved Document P: a new circuit, a replacement consumer unit, or any addition or alteration to existing circuits in a special location, such as the area around a bath or shower. Everything else is non-notifiable, though it still has to be safe and certified.

For notifiable work there are three routes: self-certify through a registered competent person scheme, use a registered third-party certifier, or notify building control before you start. A registered installer completes a BS 7671 certificate for every job and gives it to the person who ordered the work. Within 30 days of completion, the occupier must get a copy of the Building Regulations compliance certificate, and building control gets the information too. Your scheme usually handles that once you register the job.

Wales, Scotland and Northern Ireland have their own building regulations. Check with the local building control body or your scheme before relying on the England rules.

What does a landlord need, and by when?

In England, private and social landlords must have the installation inspected and tested at least every five years by a qualified person, and act on the result. The report is usually an EICR. The rules now cover social housing too: they came into force in that sector on 1 November 2025, and tenancies granted before 1 December 2025 have until 1 November 2026 for the first inspection.

Worked example

Landlord EICR comes back unsatisfactory: the deadlines

A two-bed rental in England, inspected on Tuesday 3 November 2026. The report has one C2 (no RCD protection on the socket circuits) and one C3.

Copy of the report to the existing tenantwithin 28 days of the inspection1 Dec 2026
Remedial work for the C2within 28 days, or sooner if the report says1 Dec 2026
Written confirmation of the work to tenant and councilwithin 28 days of completing itby 29 Dec 2026 if done 1 Dec
Copy to the council if it askswithin 7 days of the request7 days
Next inspectionat least every 5 yearsby 3 Nov 2031
The C3 doesn't need fixing to comply. Confirmation after remedial work can be an EIC, a minor works certificate or a satisfactory EICR, depending on the job. Deadlines from the GOV.UK guidance.

Councils can fine landlords up to £40,000 for breaches. The landlord also has to give the report to a new tenant before they move in, and to a prospective tenant within 28 days of asking. The landlord keeps it until the next inspection and gives a copy to whoever does that one.

Other nations differ. In Wales, landlords must have the installation tested every five years and make the report available within 14 days of the occupation date. In Scotland, the repairing standard requires inspection at intervals of no more than five years and PAT testing of appliances the landlord provides. Northern Ireland's rules apply to all new private tenancies from 1 April 2025, with existing ones given until 1 December 2025.

Who gets which document?

DocumentGive toAlso
EIC with schedulesThe person who ordered the workPassed to the owner if that's someone else; in the health and safety file on CDM jobs
Minor works certificateThe person who ordered the workKeep a copy
EICRThe person who ordered itLandlord passes copies to tenants and council
Building Regs compliance certificateThe occupier, within 30 daysBuilding control gets the information

The IET's guidance tells recipients to keep the original EIC safe and show it to anyone who later works on or inspects the installation.

How long should you keep certificates?

No single rule for contractors, so keep them long enough to defend your work. The IET calls the EICR a valuable document that should be retained for future reference, and the EIC shows the installation met BS 7671 when you handed it over. Landlords in England keep an EICR until the next one supersedes it; in Scotland, landlords keep a copy for six years.

A practical approach: store every certificate as a PDF against the job and the address, named so you can find it in a year. If a customer calls about a tripping RCD three years later, your test results are the evidence of what you left.

Before you leave the job

If your admin only gets done on Monday mornings, a week of landlord EICRs and minor works waiting for that slot is where certificates go missing. The RAMS master template guide covers the safety paperwork side, and health and safety for small firms covers what you must write down.

This guide is a summary. For a specific installation, BS 7671 and your competent person scheme's rules take priority.

Where Nexley fits

Nexley is the AI back office for UK trade firms: five AI assistants run your tenders, quotes, buying, scheduling and invoicing. It connects to the tools you already work in, you run it all from WhatsApp, and you approve everything. £799 a month.

For certificates, Nexley files each EIC, minor works certificate and EICR against the address and job, reminds you of registration deadlines for notifiable work, and drafts the cover email to the customer or landlord. You send test results or a photo of the form on WhatsApp, and you approve anything before it goes out.

Common questions

Not for owner-occupiers. It is required for rented homes in England, Wales, Scotland and Northern Ireland under each nation's own rules. Homeowners often get one when buying or selling, or when the last report recommends it.

Can I use a minor works certificate for a consumer unit change?

No. The IET form says it can't be used for replacing distribution boards or similar items. A consumer unit change needs an EIC, and in a home in England it is also notifiable under Part P.

Does a C3 make an EICR unsatisfactory?

No. C3 means improvement recommended. Only C1, C2 or FI observations make the overall condition unsatisfactory.

Can a new EIC replace a landlord's EICR?

Yes, in England. GOV.UK guidance says an EIC for a newly built or fully rewired home can be provided, which avoids further checks for five years. Scotland's guidance allows an EIC from the last five years if its next-inspection date hasn't passed.

Sources

  1. IET: BS 7671 model forms
  2. IET: Electrical Installation Certificate model form, BS 7671:2018+A4:2026
  3. IET: Electrical Installation Condition Report model form, BS 7671:2018+A4:2026
  4. IET: Minor Electrical Installation Works Certificate, BS 7671:2018+A4:2026
  5. GOV.UK: Electrical safety standards in the private and social rented sectors
  6. GOV.UK: Approved Document P, electrical safety in dwellings
  7. GOV.WALES: Fitness for human habitation, guidance for contract holders
  8. gov.scot: Repairing standard, installations for the supply of electricity
  9. NI Department for Communities: Electrical Safety Standards for Private Tenancies Regulations 2024

Every rule, rate and date above was checked against these sources on the date shown at the top.

Topic: Safety, certificates and compliance

Keep reading

Safety, certificates and compliance

Construction phase plan for small jobs, with a template

Under CDM 2015, the builder writes the construction phase plan on most small jobs, before work starts. This guide gives a fill-in template based on HSE's own, a worked example for a kitchen extension, and a quick check on notification.

29 Oct 2026, 8 min read, Kade Dillon

Safety, certificates and compliance

F-gas certification for air conditioning installers

Installing split air conditioning means working on a refrigerant circuit, and that needs two certificates: one for the engineer and one for the business. This guide has a quick check for which you need, Refcom's fees worked out per year, and what electricians can and can't do.

29 Oct 2026, 7 min read, Kade Dillon

Try it on your own jobs

7 days free, then £799 a month. No contract.

Runs in WhatsApp Set up on a 20-minute call Cancel anytime
Does what it says really. Compared to what I’d have to pay someone to do everything they’re looking after, it’s worth it.”
— MJ

Book a demo with Kade

A 20-minute call. Pick a time that suits and he’ll show you Nexley on your own work.

WhatsApp Us